Commercial TPO roof replacement in Colorado Springs.

A worn flat roof with ponding stains, taken down to the deck. We replaced the rotted sections, fastened a new cover board, and heat-welded a white TPO membrane across the field and up the parapet walls.

The finished roof
The finished roof
TPOHeat-welded single-ply membrane
Full tear-offDown to the roof deck
3 daysTear-off to finished membrane
Colorado SpringsCommercial low-slope roof

The result

Before and after.

The same roof, at the first inspection and after the last weld.

Before: ponding stains and worn membrane
Before: ponding stains and worn membrane
After: new white TPO
After: new white TPO

Step by step

How we built it.

Every step was photographed on site. Tap a photo to see it larger.

March 19Inspection

Inspecting the existing roof

We walked the whole roof and documented what was failing: ponding stains in the low spots, aged and stained membrane, and worn flashing at the openings.

March 28Day 1

Tear-off down to the deck

The crew removed the whole existing roof, so nothing was left hidden under the new one. With the deck open, every drain and opening could be checked.

March 28Day 1

Repairing the deck

The tear-off uncovered rotted and worn-out decking. Those sections were cut out and replaced with new sheathing before anything went on top.

March 28 to 29Days 1 and 2

Cover board, fastened down

DensDeck cover board was laid across the field and fastened with plates on a tight pattern. It gives the membrane a solid, smooth base.

March 29Day 2

Membrane and parapet walls

The TPO sheets went down across the field and were fastened at the base of each wall. Then the parapet walls were wrapped in membrane and tied into the field sheets.

March 30Day 3

The finished roof

A clean, bright white TPO roof, with the vents and drains flashed in and the parapet walls covered.

April 22Follow-up

Final seam inspection

We came back and walked the roof seam by seam, probing the heat-welded laps to confirm the welds are solid.

What was done

Scope of work.

  • Inspection before the job: ponding, drains, openings, and parapet heights documented
  • Complete tear-off of the existing roof
  • Deck inspected, with damaged and rotted sections cut out and replaced
  • DensDeck cover board installed and fastened with plates
  • White TPO membrane installed with heat-welded seams
  • Parapet walls prepped and wrapped in membrane
  • Drains, vents, and openings flashed in
  • Final walk of the roof, probing the welds seam by seam

Read more about commercial roofing, or see the commercial roof systems we install.